The Tenant’s Opening File: Ten Records to Secure at Lease Commencement
Photo: commercial lease documents keys office desk UK, via i.pinimg.com
A new commercial lease is usually celebrated with keys, a fit-out plan and a long list of practical tasks. The property file is often left for later. That is a mistake. The documents that should be collected at commencement are the same documents the board will need when something goes wrong: a fire, a flood, an insurer’s questionnaire, a service charge dispute or a dilapidations claim at the end of the term.
This is not about creating an archive for its own sake. It is about governance discipline. The day-one file gives the board a baseline, a set of responsibilities and a way to check that the landlord, managing agent and company are each doing what the lease requires. The following ten records should be secured, indexed and assigned an owner.
1. The signed lease and every side letter
Collect the executed lease, all plans, schedules and side letters, any rent-free or turnover arrangements, break clauses, rent review provisions and alteration rights. Note the dates that matter: commencement, rent commencement, break dates, review dates and the end of term. A lease summary of no more than two pages is useful for the board, but it should sit alongside the full document.
2. The current service charge budget and last accounts
Ask for the current service charge budget, the apportionment method, the latest reconciliation and any reserve fund statement. Check what is included and what is excluded. Diarise the date by which the company can challenge the service charge. Without the budget and accounts, the board cannot test whether the charge is being managed.
3. The schedule of condition and dilapidations baseline
If the lease includes a schedule of condition, secure the signed version with all photographs. If it does not, commission a dated photographic and written record at commencement. This is the single most useful defence against a dilapidations claim. It should show the condition of floors, walls, ceilings, services, glazing, external areas and any landlord fixtures.
4. Landlord and managing agent contacts, including escalation
Record named contacts for rent, service charge, insurance, repairs and out-of-hours emergencies. Include the managing agent’s portal, the emergency line and the escalation route if a repair is not actioned. A generic email address is not a contact plan.
5. The fire risk assessment and evacuation arrangements
Obtain the current fire risk assessment and confirm who is the responsible person for the demised premises and who controls the common parts. Collect the evacuation plan, assembly point details, drill records and any personal emergency evacuation plan arrangements that affect the company. Check the lease allocation of fire safety duties rather than assuming the landlord covers everything.
6. The asbestos register and management plan
For premises built before 2000, ask for the asbestos register, survey and management plan. Confirm who manages asbestos-containing materials and what contractors need to know before accessing ceiling voids, plant rooms or service risers. A missing register is a red flag that should be escalated before fit-out works begin.
7. Statutory compliance certificates
Collect the electrical installation condition report, gas safety certificate where applicable, legionella risk assessment, lift and emergency lighting records, fire extinguisher servicing and any other statutory inspection relevant to the building. Record the date of the next inspection and who is responsible for commissioning it.
8. The energy performance certificate and utility information
Secure the current EPC and check the rating against the minimum energy efficiency requirements for the letting. Record meter numbers, meter readings at commencement, supply contracts and utility account details. These records support both cost control and any future energy or sustainability reporting.
9. Insurance details and insured risks
Obtain the landlord’s building insurance summary, the insured risks, any waiver of subrogation and the tenant’s obligations to insure. Notify the company’s own insurer or broker of the new premises and confirm cover for contents, public liability, business interruption and any tenant’s improvements. Record the policy numbers and renewal dates.
10. Consents, licences and alterations file
Collect planning permissions, building regulations completion certificates, landlord consents for signage, alterations or permitted use, and any wayleave or access agreements. This file becomes the baseline for future fit-out requests and helps avoid disputes about what was approved before the company arrived.
Build the file as a board register
A pile of PDFs is not a governance file. Index the ten records, assign an owner for each, note the review date and store them in a secure, backed-up location. The board should approve the day-one checklist and receive a short confirmation that the file is complete, with any gaps flagged. Gaps are acceptable if they are known and being chased. Unknown gaps are the risk.
The first week of a lease is busy, but the ten records above can usually be requested in one email and indexed in one afternoon. Reconstructing them after an incident, audit or dilapidations claim takes far longer.